Engine Removal & Replacement – FAA A&P / AMT Powerplant Study Guide

Prepare Smart, Study Strong, Pass with Confidence

Aircraft engine removal and replacement is one of the most demanding maintenance operations an A&P mechanic may perform. The job involves much more than disconnecting an old engine and installing another one. It requires careful planning, correct lifting and support equipment, protection of aircraft systems, accurate reconnection and rigging, thorough inspections, and operational testing before the aircraft can safely return to service.

The primary FAA reference for this subject is FAA-H-8083-32B, Aviation Maintenance Technician Handbook—Powerplant, Chapter 8: Engine Removal & Replacement. The FAA’s current handbook specifically covers reasons for aircraft engine removal, preparation for aircraft engine installation, QECA buildup, depreservation, external powerplant systems, electrical and control disconnects, lines, hoisting, mounting, rigging, adjustment, and testing. Study FAA A&P engine removal and replacement, including engine hoisting. QECA, disconnects, installation, rigging, servicing, inspection, testing, and maintenance records.

Students preparing for the FAA Powerplant knowledge exam should understand both the sequence for an aircraft engine change and why each step is necessary. The Volarprep.com FAA A&P Study Guide and Practice Tests can then be used to practice FAA-style questions and review detailed answer explanations.

Why Aircraft Engines Are Removed

An aircraft engine may be removed for scheduled or unscheduled reasons. Removal does not necessarily mean that the engine has experienced a catastrophic failure.

An engine may be removed because of:

  • Expiration of an engine or component life limit
  • Scheduled overhaul or major maintenance
  • Sudden stoppage
  • Propeller strike
  • Abnormal reduction in engine speed
  • Metal contamination found in the oil system
  • Results of spectrometric oil analysis
  • Unsatisfactory engine condition-monitoring results
  • Persistent operational problems
  • Damage requiring repair that cannot practically be accomplished while installed
  • Replacement or modification requirements

The FAA specifically discusses engine/component lifespan, sudden stoppage and propeller strikes, sudden speed reduction, metal particles in oil, spectrometric oil analysis, turbine condition-monitoring programs, and operational problems as reasons that can lead to removal.

These conditions also demonstrate why Engine Inspection and Engine Lubrication Systems are closely related to engine removal decisions.

Engine Life Limits and Scheduled Removal

Aircraft engines and engine components are operated and maintained according to applicable manufacturer instructions and approved maintenance requirements.

Certain components may have mandatory life limits. Other engines may be removed for overhaul, inspection, repair, modification, or operator maintenance-program requirements.

Before deciding what maintenance is required, the mechanic must identify the exact engine model, configuration, operating history, maintenance status, and applicable technical data.

Never assume that requirements for one engine apply to another simply because the engines appear similar.

Sudden Stoppage and Propeller Strike

A reciprocating engine can experience severe internal loading when the propeller strikes an object or when the engine is stopped suddenly.

Damage is not always externally visible.

A sudden stoppage can transmit loads through the propeller and crankshaft into internal engine components. The manufacturer’s instructions determine what inspection or maintenance is required following such an event.

The mechanic should never substitute a visual inspection alone when the applicable manufacturer’s instructions require additional inspection or reciprocating engine removal.

Metal Particles in Engine Oil

Metal discovered in an engine’s oil system can indicate internal wear or component deterioration.

The significance depends upon factors such as:

  • Type of metal
  • Quantity
  • Particle size
  • Location where the contamination was found
  • Engine operating history
  • Manufacturer limits

Metal may be discovered in:

  • Oil filters
  • Oil screens
  • Magnetic plugs
  • Chip detectors
  • Oil samples

The mechanic must use the manufacturer’s maintenance instructions to determine the required action.

This is another reason Engine Lubrication Systems and Engine Inspection are important supporting subjects.

Spectrometric Oil Analysis

Spectrometric oil analysis can help identify very small quantities of particular metals suspended in engine oil.

A single sample is often less useful than a trend established from samples taken over time. Changes in the concentration of specific metals may indicate abnormal wear before the problem becomes obvious through other inspection methods.

Oil-analysis results are therefore one part of an overall engine-condition assessment rather than an automatic diagnosis by themselves.

Turbine Engine Condition Monitoring

Modern turbine engines may be monitored through engine-condition or trend-monitoring programs.

Parameters can include engine speed, temperature, pressure, fuel flow, vibration, oil-system information, and other engine-specific data.

A gradual change in performance may provide evidence of engine deterioration before a serious operational problem occurs.

The exact parameters, limits, and maintenance actions are determined by the engine manufacturer and operator’s approved program.

Review Turbine Engines and Full Authority Digital Engine Control (FADEC) for related modern turbine-engine monitoring concepts.

Planning an Engine Change

An engine change should begin with planning—not with removing components.

Before work begins, technicians should determine:

  • Exact engine and aircraft configuration
  • Applicable maintenance procedures
  • Required tooling
  • Required lifting equipment
  • Engine stand requirements
  • Replacement parts and consumables
  • Required inspections
  • Applicable Airworthiness Directives
  • Applicable modifications
  • Required servicing materials
  • Personnel requirements
  • Aircraft support requirements
  • Required operational tests

A properly planned engine change reduces the possibility of damaging the aircraft, engine, accessories, wiring, hoses, lines, mounts, and surrounding structure.

Use the Correct Maintenance Information

The FAA handbook provides the principles mechanics need to understand, but an actual engine change must be performed using the maintenance information applicable to that aircraft and engine.

The Aircraft Maintenance Manual (AMM) may provide aircraft-specific engine removal procedures and installation procedures.

The Illustrated Parts Catalog (IPC) helps identify correct parts and hardware.

The Wiring Diagram Manual (WDM) is important when identifying electrical connections.

The Fault Isolation Manual (FIM) can assist with troubleshooting problems discovered during operational testing.

Applicable Service Bulletins (SBs) and Airworthiness Directives (ADs) must also be considered.

Preparing the Aircraft

Before removing the engine, safely position and prepare the aircraft.

Depending upon the aircraft, preparation can include:

  • Positioning the aircraft in an approved work area
  • Installing wheel chocks
  • Grounding the aircraft where required
  • Disconnecting or isolating electrical power
  • Installing safety devices
  • Opening or removing cowling and nacelle panels
  • Providing suitable fire protection
  • Positioning maintenance stands
  • Preparing lifting equipment
  • Protecting surrounding structure

Aircraft stability must also be considered.

Removing a heavy engine changes the aircraft’s weight distribution and center of gravity. Manufacturer instructions may require specific aircraft support, ballast, jacking, or other precautions.

Preparing the Engine for Removal

The mechanic should systematically expose and identify everything connecting the engine or powerplant assembly to the aircraft.

Depending upon the installation, this can include:

  • Electrical wiring
  • Engine controls
  • Fuel lines
  • Oil lines
  • Hydraulic lines
  • Pneumatic lines
  • Bleed-air ducts
  • Breather lines
  • Vent lines
  • Fire-detection wiring
  • Engine-indicating-system connections
  • Starter connections
  • Generator connections
  • Grounding or bonding connections
  • Exhaust or nacelle connections
  • Engine mounts

The FAA’s Chapter 8 separately addresses draining, electrical disconnects, engine-control disconnects, line disconnects, and other disconnects before engine removal.

Draining Fluids

Depending upon the engine and installation, fluids may need to be drained before disconnection.

These may include:

  • Fuel
  • Engine oil
  • Hydraulic fluid
  • Other installation-specific fluids

The objective is to reduce spills, contamination, fire hazards, and unnecessary fluid loss.

Correct containers and handling procedures should be used.

Fuel and oil should never simply be allowed to drain onto the hangar floor or ramp.

Electrical Disconnects

Modern engines can have numerous electrical connections.

Examples include:

  • Starter wiring
  • Starter-generator wiring
  • Generator or alternator wiring
  • Ignition wiring
  • Temperature sensors
  • Pressure sensors
  • Speed sensors
  • Engine indicating circuits
  • FADEC/EEC connections
  • Fire-detection circuits
  • Grounding and bonding connections

Connections should be identified according to the applicable maintenance procedure before disconnection.

Modern connectors require particular care because bent pins, contamination, damaged seals, improper locking, or wiring damage can create difficult intermittent faults after installation.

Review Engine Electrical Systems and the Wiring Diagram Manual (WDM) for related information.

Disconnecting Engine Controls

Mechanical engine controls must be disconnected according to the manufacturer’s instructions.

Depending upon the installation, these may include:

  • Throttle or power controls
  • Mixture controls
  • Propeller controls
  • Condition controls
  • Fuel shutoff controls
  • Other engine-specific linkages

Control rods, cables, bellcranks, rod ends, and attachment hardware should be handled carefully.

Do not change adjustments unnecessarily.

Incorrect control rigging after installation can prevent the engine from reaching required operating positions or can allow the control to contact a stop incorrectly.

Disconnecting Lines

Aircraft engines can have many fluid and pneumatic connections.

These can include:

  • Fuel supply
  • Fuel return
  • Oil supply
  • Oil return
  • Hydraulic lines
  • Pneumatic lines
  • Bleed-air ducts
  • Breather lines
  • Vent lines

Before disconnecting a line, identify it positively.

As lines are disconnected, protect them from contamination.

The FAA’s engine-removal guidance emphasizes plugging disconnected lines to prevent foreign material from entering the system.

Cap and Plug Open Systems

One of the simplest engine-change practices is also one of the most important:

Protect every open system from contamination.

Open lines and fittings can allow:

  • Dirt
  • Dust
  • Moisture
  • Hardware
  • Shop debris
  • Foreign material

to enter systems that depend upon extremely clean fluids or airflow.

Use the correct protective caps and plugs.

Do not use improvised materials that can deteriorate, shed particles, or become forgotten inside the system.

Identification and Tagging

An engine installation may contain dozens of similar-looking connections.

Proper identification during removal makes installation safer and more efficient.

Identification should follow the organization’s approved practices and applicable maintenance instructions.

Good identification helps prevent:

  • Cross-connected lines
  • Incorrect electrical connections
  • Improper control installation
  • Missing connections
  • Incorrect routing

Never rely entirely on memory.

Final Check Before Lifting

Before the engine is moved, perform a careful inspection of the entire installation.

Verify that all required:

  • Lines
  • Wires
  • Controls
  • Ducts
  • Grounds
  • Brackets
  • Clamps
  • Accessories
  • Structural connections

that must be disconnected have actually been disconnected.

The FAA specifically emphasizes rechecking disconnect points before moving a powerplant.

A forgotten hose or wiring harness can be destroyed when thousands of pounds of engine begin moving.

Engine Hoisting

Aircraft engine hoisting must be done using equipment suitable for the engine and installation.

This can include:

  • Engine hoists
  • Overhead cranes
  • Engine slings
  • Lifting beams
  • Manufacturer-specified lifting fixtures

The lifting equipment must have adequate capacity and be properly positioned.

The correct lifting points must be used.

Never lift an aircraft engine from a convenient-looking component unless that component is specifically approved as a lifting point.

Center of Gravity During Hoisting

The engine’s center of gravity is extremely important.

If the lifting point is not correctly positioned relative to the engine or powerplant assembly’s center of gravity, the assembly can tilt unexpectedly when its mounts are released.

That can:

  • Damage the engine
  • Damage the aircraft
  • Damage accessories
  • Damage the nacelle
  • Injure personnel

FAA Chapter 8 specifically warns that the sling must be adjusted so the hoisting eye is positioned over the powerplant assembly’s center of gravity on applicable installations.

Engine Mounts

Engine mounts transfer engine loads into the aircraft structure.

Before removal, the engine must be adequately supported so that mount hardware is not carrying uncontrolled loads as bolts or attachments are removed.

Mount components should be inspected for applicable conditions such as:

  • Cracks
  • Corrosion
  • Deformation
  • Worn hardware
  • Damaged bushings
  • Deteriorated isolators
  • Loose fittings
  • Evidence of movement

Inspection criteria are manufacturer-specific.

Removing the Engine

Once the engine is supported and all required connections have been removed, the engine can be separated from the aircraft according to the manufacturer’s procedure.

Movement should be slow and controlled.

Technicians should watch clearances around:

  • Firewall
  • Nacelle
  • Mounts
  • Wiring
  • Lines
  • Ducting
  • Accessories
  • Structure

Do not allow the engine to swing uncontrolled.

Once clear of the aircraft, the engine should be moved to the approved engine stand.

Engine Stands

An engine stand provides stable support after removal.

The stand must be:

  • Correct for the engine
  • Structurally suitable
  • Properly positioned
  • Securely attached
  • Stable before the lifting device is released

Never release the hoist until the engine is completely secured to the stand.

Quick Engine Change Assembly — QECA

The FAA discusses the QECA buildup method for changing engines in Chapter 8.

QECA means Quick Engine Change Assembly.

Instead of transferring every usable accessory from the removed engine individually while the aircraft remains out of service, an engine can be prepared with many of the components required for installation.

Depending upon the installation, a QECA can include items such as:

  • Engine
  • Accessories
  • Wiring
  • Plumbing
  • Mounting components
  • Cowling or nacelle-related components
  • Other installation hardware

The exact contents depend upon the aircraft and engine.

The objective is to reduce aircraft downtime and make engine replacement more efficient.

Preparing the Replacement Engine

Before installation, verify that the aircraft engine replacement is correct for the aircraft and installation.

This may involve checking:

  • Engine model
  • Serial number
  • Configuration
  • Modification status
  • Applicable service information
  • Airworthiness Directive compliance
  • Accessory configuration
  • Preservation status
  • Required documentation

An engine that physically fits the mounts is not automatically approved for the aircraft.

FAA certification information notes that an engine must meet the applicable aircraft installation requirements in addition to its engine type certification.

Engine Depreservation

Replacement or stored engines may have been preserved to protect internal components against corrosion.

Before installation or operation, the engine must be depreserved according to the applicable instructions.

Depreservation may require:

  • Removal of protective covers
  • Removal of desiccants
  • Removal or treatment of preservation oil
  • Inspection of openings
  • Inspection for corrosion
  • Servicing with specified lubricants
  • Accessory preparation
  • Other manufacturer-required procedures

The FAA specifically includes Depreservation of an Engine and Inspection & Depreservation of Accessories in Chapter 8.

Inspection of Accessories

Accessories being transferred or installed should be inspected before installation.

Depending upon the engine, these may include:

  • Starter
  • Starter-generator
  • Alternator or generator
  • Fuel pump
  • Fuel control
  • Magnetos
  • Ignition components
  • Oil pumps
  • Hydraulic pumps
  • Sensors
  • Other engine-driven accessories

Check applicable condition, eligibility, part numbers, service status, and installation requirements.

Do not install a questionable accessory simply because it was attached to the previous engine.

Inspect the Aircraft Before Installing the Engine

Engine removal provides access to areas that may normally be difficult to inspect.

This is an excellent opportunity to inspect:

  • Firewall
  • Engine mounts
  • Nacelle structure
  • Wiring
  • Connectors
  • Fuel lines
  • Oil lines
  • Hydraulic lines
  • Pneumatic ducts
  • Control cables and linkages
  • Fire-detection components
  • Clamps and supports
  • Drain systems
  • Heat shielding

FAA Chapter 8 specifically includes inspection and replacement of powerplant external units and systems before installation.

Finding problems now is much easier than finding them after the replacement engine has been installed.

Hoisting the Replacement Engine

The replacement engine is attached to the correct sling or lifting fixture and carefully raised into position.

Again, center-of-gravity control is essential.

The engine should be moved slowly toward the aircraft while technicians continuously monitor clearance.

Never use mount bolts to pull a badly misaligned engine into position.

Installing Engine Mount Hardware

The engine must be correctly aligned with its mounting points.

On applicable installations, all mount bolts may be started before final tightening or torqueing so the assembly can settle into correct alignment. FAA material gives this sequence for the representative QECA installation it discusses.

Use the manufacturer’s specified:

  • Hardware
  • Washers
  • Nuts
  • Bushings
  • Isolators
  • Lubrication
  • Torque values
  • Safetying methods

Never substitute generic torque values when the aircraft or engine maintenance manual provides a specific requirement.

Reconnecting Lines and Ducts

Once the engine is structurally secured, disconnected systems can be restored according to the installation procedure.

Connections may include:

  • Fuel
  • Oil
  • Hydraulic
  • Pneumatic
  • Bleed air
  • Breather
  • Vent
  • Drain

Before connection:

  • Remove protective caps and plugs
  • Inspect fittings
  • Check seals
  • Verify routing
  • Confirm identification
  • Ensure cleanliness

After connection, check for correct support and clearance.

Reconnecting Electrical Systems

Reconnect electrical systems carefully.

Check:

  • Connector identification
  • Pin condition
  • Connector engagement
  • Locking devices
  • Harness routing
  • Clamping
  • Grounding
  • Bonding
  • Heat clearance
  • Chafing protection

Modern turbine installations can contain extensive electronic engine-control wiring, making correct routing particularly important.

Review Engine Electrical Systems and Full Authority Digital Engine Control (FADEC) for related systems.

Engine Control Rigging

Engine-control rigging is a critical part of installation.

Controls must move through their required range and reach the correct positions.

Depending upon the aircraft, this can involve:

  • Throttle
  • Power lever
  • Mixture
  • Propeller control
  • Condition lever
  • Fuel cutoff

The FAA handbook specifically includes Rigging, Inspections, and Adjustments, including power-control rigging and fuel-control adjustment, in its engine-removal and replacement material.

Check for:

  • Full travel
  • Correct stops
  • Correct direction
  • Freedom of movement
  • Required clearances
  • Correct adjustment
  • Proper safetying

Servicing the Installed Engine

Before operation, service the engine and associated systems as required.

This can include:

  • Engine oil
  • Hydraulic fluid
  • Fuel-system preparation
  • Coolant on applicable engines
  • Other installation-specific servicing

Use only the correct fluid specification and quantity.

Review Engine Lubrication Systems and Engine Fuel and Fuel Metering Systems for related Powerplant study.

Pre-Run Inspection

Before the first engine start following replacement, perform a complete engine installation inspection.

Verify:

  • Tools removed
  • Rags removed
  • Caps and plugs accounted for
  • Controls connected
  • Wiring connected
  • Lines connected
  • Clamps installed
  • Mounts secured
  • Hardware safetied
  • Fluids serviced
  • Cowling configuration correct for the test
  • Fire extinguisher available as required
  • Area clear

Foreign object damage after an engine change can result from something as simple as one forgotten tool.

Initial Engine Start

The initial start should be performed according to the applicable manufacturer procedure.

Closely monitor engine indications.

Depending upon engine type, these may include:

  • Oil pressure
  • Oil temperature
  • Fuel pressure
  • Fuel flow
  • RPM
  • N1
  • N2
  • EGT/ITT/TGT
  • Torque
  • Manifold pressure
  • Electrical indications
  • Vibration

Be prepared to shut down the engine if an unsafe indication occurs.

Leak Inspection

After engine operation, inspect the installation for leaks.

Potential leak sources include:

  • Fuel fittings
  • Oil fittings
  • Hydraulic connections
  • Drain lines
  • Accessory connections
  • Filters
  • Pumps
  • Hoses
  • Seals

A fitting that appears dry before the engine is operated may leak when the system is pressurized and hot.

Operational Checks

Installation is not complete merely because the engine runs.

Required operational checks may include:

  • Idle operation
  • Acceleration
  • Deceleration
  • Engine-control operation
  • Propeller operation
  • Generator operation
  • Starter-generator operation
  • Bleed-air operation
  • Anti-ice operation
  • Engine indications
  • FADEC/EEC checks
  • Ignition checks
  • Leak checks
  • Other aircraft-specific tests

Use the manufacturer’s procedures and limits.

Turbine Engine Trim Checks

Certain turbine-engine installations may require a trim or performance check following engine installation or fuel-control work.

FAA handbook material describes representative trim checks using atmospheric conditions and manufacturer data to establish target engine parameters, followed by an engine run to verify that actual values fall within specified tolerances.

Never use a generic trim chart from another engine.

The applicable manufacturer’s data determines:

  • Required atmospheric corrections
  • Target parameters
  • Operating conditions
  • Adjustment procedures
  • Allowable tolerances

Reciprocating Engine Replacement

Reciprocating-engine changes have their own installation considerations.

Depending upon aircraft design, these can include:

  • Engine mount alignment
  • Propeller installation
  • Magneto connections
  • Ignition harnesses
  • Carburetor or fuel-injection controls
  • Mixture controls
  • Induction ducts
  • Exhaust systems
  • Cooling baffles
  • Oil lines
  • Fuel lines
  • Electrical systems

Cooling baffles and seals are especially important because incorrect installation can seriously affect cylinder cooling.

Turboprop Engine Replacement

Turboprop installation combines turbine-engine requirements with propeller-system requirements.

The FAA notes that turboprop QECA procedures are generally similar to turbine-engine procedures but include systems associated with the turboprop propeller.

Additional considerations may involve:

  • Propeller control
  • Condition lever
  • Propeller governor
  • Feathering system
  • Beta/reverse system
  • Propeller installation
  • Rigging
  • Propeller system operational checks

Turbofan and Turbojet Engine Replacement

Large turbine-engine changes can involve complex nacelle and aircraft interfaces.

Systems can include:

  • Fuel
  • Oil
  • Hydraulic
  • Electrical
  • Pneumatic
  • Bleed air
  • Fire detection
  • Engine controls
  • FADEC/EEC
  • Thrust reverser
  • Engine indicating systems

The mechanic must understand that these systems interact.

A problem discovered during the post-installation engine run may not necessarily be an internal engine problem. It could result from an incorrectly connected sensor, electrical connector, pneumatic line, control system, or aircraft interface.

Protect Against Foreign Object Damage

FOD prevention is critical throughout an engine change.

Maintain control of:

  • Tools
  • Hardware
  • Safety wire
  • Caps
  • Plugs
  • Rags
  • Packaging
  • Cleaning materials
  • Personal items

Inspect the inlet, exhaust, nacelle, and surrounding work area before engine operation.

A small object left in an inlet can become a major engine failure after start.

Human Factors During an Engine Change

Engine replacement frequently involves several mechanics working simultaneously.

That creates opportunities for:

  • Miscommunication
  • Interrupted tasks
  • Assumptions
  • Incomplete work
  • Shift-change errors
  • Missed connections
  • Improper torque
  • Missing safety devices

Good task turnover is therefore critical.

Technicians should clearly communicate:

  • What has been completed
  • What remains open
  • Which connections are incomplete
  • Which hardware is not torqued
  • Which systems are not serviced
  • Which inspections remain outstanding

Review Human Factors for FAA A&P Mechanics for additional information on communication, fatigue, teamwork, and maintenance error prevention.

Maintenance Records

After an engine replacement, the required maintenance must be properly documented.

Records should accurately describe the work performed and include the information required by applicable regulations.

Depending upon the work, records can include:

  • Engine identification
  • Removal information
  • Installation information
  • Engine time
  • Applicable inspections
  • AD compliance
  • Parts or component information
  • Operational checks
  • Return-to-service information

A mechanically correct engine change with incomplete records is still an incomplete maintenance job.

The Complete Engine-Change Process

For FAA A&P study purposes, remember the overall sequence:

PLAN → PREPARE → IDENTIFY → DISCONNECT → PROTECT → SUPPORT → REMOVE → INSPECT → PREPARE REPLACEMENT → INSTALL → CONNECT → RIG → SERVICE → INSPECT → TEST → DOCUMENT

PLAN

Obtain the correct maintenance information, equipment, personnel, and replacement engine.

PREPARE

Secure the aircraft and prepare the engine compartment.

IDENTIFY

Identify connections before disturbing them.

DISCONNECT

Disconnect electrical, mechanical, fluid, pneumatic, and structural connections as instructed.

PROTECT

Cap and plug open systems and protect wiring and structure.

SUPPORT

Attach approved lifting equipment and control the engine center of gravity.

REMOVE

Release the engine mounts and move the engine clear without damaging surrounding components.

INSPECT

Inspect the engine compartment, mounts, firewall, systems, wiring, lines, and accessories.

PREPARE REPLACEMENT

Verify eligibility, configuration, preservation status, accessories, and documentation.

INSTALL

Position and secure the replacement engine according to manufacturer procedures.

CONNECT

Restore lines, wiring, controls, ducts, grounds, and other interfaces.

RIG

Adjust engine controls as required.

SERVICE

Add the required fluids and prepare systems for operation.

INSPECT

Perform a complete pre-run installation inspection.

TEST

Start, inspect for leaks, and perform required operational or trim checks.

DOCUMENT

Complete the required maintenance records.

What an A&P Mechanic Should Know

For the FAA Powerplant exam and practical maintenance, understand:

  • Reasons engines are removed
  • Sudden stoppage and propeller-strike considerations
  • Metal contamination and oil analysis
  • Turbine condition monitoring
  • Engine-change planning
  • Correct maintenance publications
  • Aircraft preparation
  • Fluid draining
  • Electrical disconnects
  • Engine-control disconnects
  • Fluid and pneumatic lines
  • Capping and plugging
  • Connection identification
  • Engine lifting equipment
  • Approved lifting points
  • Center-of-gravity control
  • Engine mounts
  • Engine stands
  • QECA
  • Depreservation
  • Accessory inspection
  • Engine-compartment inspection
  • Replacement-engine preparation
  • Engine installation
  • Electrical reconnection
  • Plumbing reconnection
  • Control rigging
  • Servicing
  • Pre-run inspection
  • Initial engine operation
  • Leak inspection
  • Operational testing
  • Turbine trim checks
  • FOD prevention
  • Human factors
  • Maintenance documentation

The FAA’s current Aviation Mechanic ACS remains FAA-S-ACS-1, effective September 21, 2022.

Study Engine Removal & Replacement With Volarprep.com

Engine removal and replacement brings together many subjects that an A&P mechanic studies separately: engine inspection, lubrication, fuel systems, electrical systems, controls, turbine systems, maintenance publications, human factors, and maintenance records.

The most important principle is simple:

An engine change is a controlled maintenance process—not just a heavy lifting operation.

Every disconnected line, wire, control, mount, clamp, fitting, and accessory must eventually return to the correct configuration. Correct maintenance information, careful identification, contamination control, proper lifting procedures, thorough inspection, accurate rigging, and complete operational testing are what turn an installed engine into an airworthy powerplant installation.

Use this page with FAA-H-8083-32B, Aviation Maintenance Technician Handbook—Powerplant, Chapter 8: Engine Removal & Replacement and the applicable aircraft and engine manufacturer’s maintenance instructions. FAA-H-8083-32B remains the FAA’s current listed AMT Powerplant handbook.

When you’re ready to test your knowledge, use Volarprep.com FAA A&P Practice Tests and review How to Pass the FAA Powerplant Exam.


These free Volarprep.com pages are designed as reference and subject-review material. Use them alongside your FAA textbooks and handbooks for detailed technical study. Then use Volarprep.com FAA A&P practice tests to apply what you have learned to FAA-style questions, review detailed answer explanations, and identify subjects that need additional study.